China Wire Rope Sling manufacturer

Shackle Lifting Rigging Hardware

Product Details:
Place of Origin: Made in China
Brand Name: SOLAR
Certification: ISO
Model Number: G2130 G2150 G210 G209 Shackle (Bow/DEE type)
Payment & Shipping Terms:
Minimum Order Quantity: 1 pcs
Price: Negotiable
Packaging Details: Pallet or other way on customers' request
Delivery Time: 3 days
Payment Terms: L/C, D/P, T/T
Supply Ability: depends on Order

Detail Information

Product Name: G2130 G2150 G210 G209 Shackle (Bow/DEE Type) Size: 3/16 To 2-1/2 In
WLL: 0.3~55ton Surface: Eelec Galvanized,Hot Galvanized, Color Painted
Material: Alloy Steel Standard: US Standard
Stock Or Not: Some Have Stock Delivery Time: 3 Days
Safety Factor: Normally 1:5 / 1:6 Condition: New
Usage: Shipping, Marine, Lifting Marking: WLL, Size
Processing: Drop Forged Packing: Pallet/Plastic Bag/Wooden Box , On Your Request
HS Code: 73269090 Port Of Origin: Shanghai China
High Light:

Shackle rope rigging hardware

,

Chain cable rigging hardware

Product Description

G2130 G2150 G210 G209 Lifting Rigging Hardware Bolt Anchor Bow Shackle US Type Chain Wire Rope Hardware Marine

 

About G2130 Shackle: (Bolt Type Anchor Shackle)

Shackle Lifting Rigging Hardware 0

Bolt Type Anchor shackles with thin head bolt - nut with cotter pin. 
Proof load: 2 x WLL.

Material: Forged – Quenched and Tempered, with alloy bolts
Marking: WLL, CE
Temperature range: -40°C up to +204°C
Finish: Galvanized with painted bolt.
Standard: EN 13889
Safety factor: 6:1/ 5:1
 

 

About G2150 Shackle: (Bolt Type Chain Shackle)

Shackle Lifting Rigging Hardware 1

Bolt Type Chain shackle. Thin hex head boltnut with cotter pin. Meets the performance requirements of Federal Specification RR-C271G.

Standard: RR-C271D

Material: Forged — Quenched and Tempered, with alloy pins.
Marking: According to standard, CE-marked
Finish: Hot Dip galvanized or self colored.
Standard: EN 13889
Safety factor: 6:1/ 5:1

 

 

About G209 Shackle:( Screw Pin Anchor Shackle)

Shackle Lifting Rigging Hardware 2

Screw pin anchor shackles meet the performance requirements of Federal Specification RR-C-271G
Proof load: 2 x WLL.

Material: Carbon steel with headbolt in alloy steel.
Marking: According to standard, CE-marked
Temperature range: -40°C up to +204°C
Finish: Hot dip galvanized.
Standard: EN 13889
Safety factor: 6:1/ 5:1

 

 

About G210 Shackle:( Screw Pin Chain Shackle)

Shackle Lifting Rigging Hardware 3

Screw pin anchor shackles meet the performance requirements of Federal Specification RR-C-271G Type IVA, Grade A, Class 2, except for those provisions required of the contractor.

Material: Forged - Quenched and Tempered, with alloy pins.
Marking: According to standard, CE-marked
Temperature range: -40° C to 204° C
Finish: Hot Dip galvanized or self colored.
Standard: EN 13889
Safety factor: 6:1

 

 

 

 

Shackle Lifting Rigging Hardware 4

 

 


 

 

Get in touch with us

Enter Your Message